Join Our Mailing List


LATEST NEWS

  • 8/05/2012 Presentation 2012 RIU Sydney Resources Roundup
    read more
  • 4/05/2012 Chalice enters into JV with ENAMCO for Mororaib and Hurum Projects
    read more
  • 27/04/2012 Shanghai Construction Group approves Zara acquisition
    read more
  • 26/04/2012 Quarterly Report - 31 March 2012
    read more
  • 26/04/2012 Appendix 5B -Quarter Ended 31 March 2012
    read more
  • 26/04/2012 Expired and Lapsed Options
    read more
  • 18/04/2012 Zara Gold Project Sale Consideration
    read more
  • 13/04/2012 Completion of SFECO Due Diligence
    read more
  • 21/03/2012 Appendix 3Y
    read more
  • 2/03/2012 Change to completion timetable for SFECO transaction
    read more
    

Zara Project Resource & Reserves

AMC Consultants Pty Ltd ("AMC") has completed a Mineral Resource and Ore Reserve estimate for the Koka Gold Deposit in Eritrea in accordance with the JORC Code.  The Indicated Resource and Ore Reserve categories referred to in the JORC Code are directly comparable to the Indicated Resource and Mineral Reserve categories defined in the CIM Definition Standards respectively.

The Mineral Resource estimate at 1 June 2010 using a 1.2 g/t gold cut-off is:  

 Category    

 Tonnes
(Mt)

 Grade
(g/t Au)

 Contained Gold
(oz)
                            

Indicated Resource    

    5.0    

   5.3   

 840,000

 

 

The Ore Reserve estimate at 1 June 2010 is:                   

 Category

 Tonnes
(Mt)

 Grade
(g/t Au)

 Contained Gold
(oz)
                            

Probable Reserve       

   4.6  

    5.1    

 760,000

 
 

Outline of the Koka Gold Deposit

Figure 1: Outline of the Koka Gold Deposit

 

 

Technical Information

This information is contained in the Technical Report on the Koka Gold Deposit, Eritrea dated 27 July 2010 and released on 8 October 2010 (the "Technical Report"). The Technical Report was prepared by Dean Carville, Bsc (Geology) (Hons), MAusIMM, MGSA, Principal Geologist at AMC Consultants Pty Ltd; David Lee, BEng (Mining) (Hons), Graduate Diploma of Business, MAusImm, Principal Mining Engineer at AMC Consultants Pty Ltd; and David Gordon, BAppSc, MAusIMM, Principal Process Engineer at Lycopodium Minerals Pty ltd (the "Authors"). Each of the Authors is an independent "Qualified Person" in accordance with National Instrument 43-101 - Standards of Disclosure for Mineral Projects.

Competent Person/Qualified Person Statements

The information contained on this website that relates to Exploration Results is based on information compiled by Dr Doug Jones, a full-time employee and Director of Chalice Gold Mines Limited, who is a Member of the Australasian Institute of Mining and Metallurgy and is a Chartered Professional Geologist. Dr Jones has sufficient experience in the field of activity being reported to qualify as a Competent Person as defined in the 2004 edition of the Australasian Code for Reporting of Exploration Results, Minerals Resources and Ore Reserves (the JORC Code) and is a "Qualified Person" under National Instrument 43-101 - 'Standards of Disclosure for Mineral Projects‘. Dr Jones consents to the release of information in the form and context in which it appears here.

The Mineral Resource estimate was prepared by Mr. John Tyrrell who is a Member of the Australasian Institute of Mining and Metallurgy. Mr. Tyrrell is a full time employee of AMC and has sufficient experience in gold resource estimation to act as Competent Person as defined in the 2004 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the JORC Code) and is a "Qualified Person" under National Instrument 43-101 - 'Standards of Disclosure for Mineral Projects'. Mr. Tyrrell consents to the inclusion of this information in the form and context in which it appears.

The information in this statement of Ore Reserves is based on information compiled by Mr David Lee who is a Member of the Australasian Institute of Mining and Metallurgy and a full time employee of AMC. Mr Lee has sufficient relevant experience to be a Competent Person as defined in the 2004 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the JORC Code) and is a "Qualified Person" under National Instrument 43-101 - 'Standards of Disclosure for Mineral Projects'. Mr Lee consents to the inclusion of this information in the form and context in which it appears. 
 

SHARE PRICE

Chalice Gold Mines Limited is dual listed
on the ASX (Code: CHN) and the
TSX (Code: CXN).

CHN: $ 0.205 AUD   + 2.50%
as at 1:45 PM AEST 18 May 2012

CXN: $ 0.21 CAD   - 4.55%
as at 11:43am ET 17 May 2012

CHN Share price chart

ASX Releases

REGISTERED OFFICE
Level 2, 1292 Hay Street
West Perth WA 6005
PO BOX 2890 Perth 6001

T: +61 (08) 9322 3960
F: +61 (08) 9322 5800
E: info@chalicegold.com

Site by Adcorp & Café Media